摘要
介绍了神华神东自备电厂 2× 100MW机组 SCS系统的设计特点,并分析了调试中出现的问题及解决方案。
Design character of Sequence Control System (SCS) at Shendong Captive Power Plant with Capacity of 2×100MW is presented in this paper. Arisen problems during commissioning are analyzed related solutions are put forward.
出处
《西北电力技术》
2000年第4期42-44,共3页
Northwest China Electric Power