摘要
某污水处理厂一期工程规模为4×104m3/d,采用卡鲁塞尔氧化沟处理工艺。污水处理厂总投资为4 600万元,单位处理成本为0.41元/m3,单位水量电耗为0.26 kw.h/m3。运行结果表明:污水处理厂各项出水指标均能稳定达到《城镇污水处理厂污染物排放标准》(GB18918-2002)一级B标准。
A wastewater treatment plant with the treatment capacity of 2.5×10^4 m3/d adopts the oxidation ditch process. The total investment for the plant is 46 million yuan, the unit operation cost is 0.41yuan/m3, the unit power consumption is 0.26 kw.h/m3. The operation results show that the effluent index can get the first level B criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB18918- 2002).
出处
《中国资源综合利用》
2013年第6期26-28,共3页
China Resources Comprehensive Utilization
关键词
污水处理厂
氧化沟
工艺设计
wastewater treatment plant
oxidation ditch
process design