挣值法和前锋线法在水利监理进度控制中应用

The Application of Earned Value Measure and Vanguard Line Method in Water Conservancy Supervision Schedule Control
下载PDF
导出
摘要 挣值法是一种有效的项目进度监控指标和方法。本文采用挣值法和前锋线法对不同节点的进度进行分析,结合工程项目,寻找滞后原因,制定对策进行纠偏,判定是否达到进度要求并佐证纠偏对策的科学性。优秀监理工程师在进度控制过程中要灵活运用挣值法和前锋线法等进行进度分析检查。 The earned value measure is an efficient project progress monitoring indicator and method. In this paper, the progress of the different node is analyzed by the earned value measure and vanguard line method. Combined with engineering project, it looks for lag reasons, formulates measures for rectifying, judges whether it meets the requirements of schedule and proofs the scientificalness of corrective measures. Good supervision engineers should flexibly use earned value measure and vanguard line method to analyze and inspect schedule in the process of schedule control.
出处 《价值工程》 2013年第21期53-55,共3页 Value Engineering
关键词 挣值法 前锋线法 进度控制 纠偏措施 earned value measure vanguard line method schedule control corrective measures
  • 相关文献

参考文献4

  • 1美国项目管理协会.项目管理知识体系指南[M].北京:机械工业出版社,2001.
  • 2潘育生.ERP项目全过程监理的进度控制[C].网络新技术与应用研讨会论文集,2005.
  • 3潘少红.受困进度跟踪挣值分析破解,www.mypm.net,2009.
  • 4中国水利工程协会.水利工程建设监理培训教材(进度控制)[M].中国水利水电出版,2007.

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部