摘要 榆林煤矿在井筒施工工程中遇到流砂层,且砂层涌水量大,造成各井筒涌水溃沙,给井筒施工带来很大困难,多次发生井筒冒顶和淹井情况,本文通过对施工困难的全面分析,提出了合理可行的解决方案,并且成功穿越了流砂层,为国内建井穿越流砂层开辟了新的途径。 Drift sand layer was met in the shaft construction of Yulin Coal Mine, and the large water inflow caused water inrush and sand inrush in all shafts, bringing great difficulties to shaft construction, and roof fall and shaft submergence happened many times. Through full analysis of construction difficulty, this paper proposes a feasible solution and managed to cross the drift sand layer and opened a new way of crossing drift sand layer in shaft construction in China.
作者 冯永波
出处 《价值工程》 2013年第21期116-117,共2页 Value Engineering
关键词 井筒施工 流砂层 溃沙冒顶 地面强排水 注浆堵水 shaft construction drift sand layer sand inrush and roof fall strong ground drainage grouting and blocking water
  • 相关文献

参考文献3

  • 1张荣立,何国纬,李铎.采矿工程手册(中册)[M].北京:煤炭工业出版社,2006.
  • 2崔云龙.简明建井工程手册(下册)[M].北京:煤炭工业出版社,2004.
  • 3刘英杰,李成涛.斜井穿越流砂层施工[J].建井技术,2006,27(4):2-4. 被引量:9

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部