摘要 建设项目概算清理,涉及面广、政策性强,再加上材料价差调整,是项目建成收尾的一项重要工作。为保证甲供、自购物资设备数量统计的准确性、价格的合理性及概算清理的公平公正性,此文针对工程设计概预算编制中存在的主要问题进行分析。通过分析,提出可采取的对策与措施。并结合某铁路站前工程,论述甲供、自购物资调整价差的范畴、物资设备价差的计算、料费方案处理、甲供材料清单单价的分析,以及建设单位和设计单位应负的责任。 The construction project budget is an important work in the project completion because its wide covers, strong policy and material price difference adjusting. To guarantee the accuracy of the statistics, the rationality of the price and the fair and justice of estimate cleaning of goods, materials and equipment num ber, in this article the engineering design main problems existing in the budget preparation are analyzed. Through the analysis, countermeasures and measures are put forward. Combined with a railway station project, this paper discusses the scope of goods and materials price difference adjustment, equipment price difference calculation, material fee processing scheme, listing price analysis, as well as the respon sibility of construction unit and design unit should bear.
作者 史亚林
出处 《铁路工程造价管理》 2013年第4期1-4,共4页 Railway Engineering Cost Management
关键词 铁路建设 概预算 物资设备 价差 清理 Railway construction Budget Supplies equipment Price difference Clearing
  • 相关文献

参考文献4

  • 1铁建设[2009]46号,关于铁路建设项目实施阶段材料价差调整的指导意见[S].
  • 2铁建设[2012]216号,铁路建设项目物资设备管理办法[S].
  • 3铁建设[2012]230号,铁道部关于补充铁路建设项目实施阶段材料价差调整目录的通知[S].
  • 4代中军.依法合规编制铁路工程概预算诌议[J].铁路工程造价管理,2012,27(5):28-32. 被引量:1

二级参考文献4

共引文献4

同被引文献12

引证文献7

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部