武汉白沙洲大桥主桥为主跨 6 18m的双塔双索面组合式斜拉桥 ,主梁采用钢箱梁与预应力混凝土箱梁组合形式结构。介绍其斜拉桥钢箱梁的安装步骤和方法 ,以及施工控制措施和手段 。
The main bridge of Wuhan Baishazhou Bridge is a double pylon, twin cable plane cable stayed bridge with a main span of 618 m. The main span is a composite structure composed of both steel and prestressed concrete box girders. The erection steps, methods and construction control measures and means of the cable stayed bridge are emphatically dealt with, and operation for closing the side span and main span are presented in details as well.
出处
《桥梁建设》
EI
CSCD
北大核心
2000年第3期49-53,共5页
Bridge Construction
关键词
斜拉桥
钢梁
混凝土梁
箱形梁
施工方法
cable stayed bridge, steel girder, concrete girder, box girder, bridge erection, construction method