期刊文献+

铁路客站钢桁架-方钢管混凝土柱节点构造优化与试验研究 被引量:2

Details improvement and experimental research on steel truss-square CFT column joints in railway station terminal
原文传递
导出
摘要 一批高铁客站采用的新型钢桁架-方钢管混凝土柱节点的力学性能、构造极其复杂,是设计的难点。由于节点是结构传递荷载的关键部位,提出简化构造措施后的新型节点。地震作用下节点性能对结构的延性有较大影响,因此有必要研究简化后新型节点的抗震性能。对这种新型连接节点进行了1∶3缩尺的模型试验,介绍了试验的加载方法,讨论了节点的受力性能、薄弱环节与破坏模式。根据试验结果,分析了简化后新型节点的承载能力与最大位移。试验表明,简化后的节点构造直接、有效,具有较高的承载能力与较好的塑性变形性能。 A new kind of joint between steel truss and square concrete-filled tube(CFT) column was adopted in some high-speed railway stations in China recently.This kind of joint which is difficult to design has complicated constructional details and mechanical performance.Because of playing an important role on load transfer in the structure,the simplified new kind of joint was proposed.For the remarkable effect on the structural ductility,some research on the seismic performance of this kind of simplified new joint should be carried out.A joint model test with a scale of 1∶3 and loading system was introduced.Load performance of this kind of simplified joint,weak position and failure mode were described.According to the test,bearing capacity and maximum displacement of this kind of simplified joint were discussed.The test shows that this kind of simplified joint has direct and effective constructional details,high bearing capacity and good plastic deformation behavior.
出处 《建筑结构》 CSCD 北大核心 2013年第13期63-66,41,共5页 Building Structure
基金 国家自然科学基金重点项目(51038008) 铁道部科研计划课题(2010G009-D)
关键词 钢桁架-方钢管混凝土柱节点 抗震性能 模型试验 破坏模式 承载能力 steel truss-square CFT column joint seismic performance model test failure mode bearing capacity
  • 相关文献

参考文献6

  • 1楼瑜杰,童乐为,谢恩,侯刚,陈以一,殷真铭.高铁虹桥站钢桁架-钢管混凝土柱节点性能试验研究[J].建筑钢结构进展,2010,12(6):19-24. 被引量:4
  • 2CECS159-2004矩形钢管混凝土结构技术规程[S].北京:中国计划出版社,2004.
  • 3CECS28:90,钢管混凝土结构设计与施工规程[S].北京:中国计划出版社,1992.
  • 4CECS2254:2009空心钢管混凝土结构技术规程[s].北京:中国建筑工业出版社,2009.
  • 5李婷,赵楠,聂建国,等.型钢混凝土柱-钢桁架节点滞回性能的试验研究[J].施工技术,2010,39(8):617-619.
  • 6AISC 341--10 Seismic provisions for structural steel buildings[ S ]. Chicago, USA : AISC, 2010.

二级参考文献9

  • 1Chiew S P,Lie S T,Dai C W.Moment resistance of steel Ibeam to CFT column connections[J].Journal of Structural Engineering-ASCE,2001,127(10):1164-1172.
  • 2Beutel J,Thambiratnam D,Perera N.Cyclic Behaviour of Concrete Filled Steel Tubular Column to Steel Beam Connections[J].Engineering Structures,2002,24(1):29-38.
  • 3Azizinamini A,Schneider S P.Moment Connections to Circular Concrete-filled Steel Tube Columns[J].Journal of Structural Engineering-ASCE,2004,130(2):213-222.
  • 4Choi S,Lee S,Hong S,et al.Structural Capacities of Tension Side for CFT Square Column-to-beam Connections with Combined-cross Diaphragm[J].Advances in Structural Engineering,2008,11 (2).209-227.
  • 5中国工程建设标准化协会标准.钢管混凝土结构设计与施工规程(CECS 28:90)[S].1990.
  • 6European Committee for Standardization (CEN).Eurocode 4:Design of Composite Steel and Concrete Structures[S].1994.
  • 7钟善桐.钢管混凝土结构[M].哈尔滨:黑龙江科学技术出版社,1994.
  • 8童乐为,王新毅,陈以一,孟宪德,王伟明,熊伟.广州新电视塔环梁-立柱-支撑-牛腿焊接节点抗弯刚度性能研究[J].土木工程学报,2010,43(7):22-28. 被引量:5
  • 9吕西林,李学平,余勇.方钢管混凝土柱与钢梁连接的设计方法[J].同济大学学报(自然科学版),2002,30(1):1-5. 被引量:99

共引文献17

同被引文献26

引证文献2

二级引证文献6