摘要
针对溜井中跑矿难以准确预测和控制,对缓冲料仓及破碎机峒室端墙进行加固。
With regards to the difficulties in Forcasting and controlling ore throw in draw hole, consolidation of the ore-surge bin and endwall of crusher chamber has been under consideration and conduction.
出处
《山西冶金》
CAS
2000年第2期19-19,59,共2页
Shanxi Metallurgy