摘要 本文结合天津市滨海新区某文化广场工程,在软土地质条件下,基坑采用钢筋混凝土桩加高压旋喷锚杆进行围护的施工工艺,需进行可行性试验。试验方法遵循《建筑基坑支护规程》(JGJ120-2012)中的规定,通过选用的5根锚杆进行试验数据分析。高压旋喷锚杆的锚固段强度较低,易造成锚杆的弹性变形较小,塑性变形较大,且蠕变系数偏大,因此,在软土地区采用高压旋喷锚杆工艺时,为满足锚固力需求,应加长锚固段的长度,并在原施工工艺中做部分改进,才能达到在软土地区应用高压旋喷锚杆的目的。 Based on the engineering of a Cultural Plaza of Binhai New Area in Tianjin,it is a kind of construction process in soft soil in which the foundation pits are supported by reinforced concrete piles and high-pressure jet grouting anchor bolts.Since it is the first time that high-pressure jet grouting anchor bolts are applied in soft soil,some kinds of feasibility experiments are necessary.The methods used in the experiment adhere to national rules in JGJ120-2012.According to experimental statistics analysis from 5 anchor bolts,as the strength of anchorage segment in the high-pressure jet grouting anchor bolt is relatively low,the bolt is usually with small elastic deformation and big plastic deformation,and the creep factor is too high.So,when applying high-pressure jet grouting anchor bolts to soft soil,in order to generate enough anchorage force,the anchorage segment should be lengthened and other improvements in the construction process should be made.
出处 《建筑科学》 北大核心 2013年第7期49-53,共5页 Building Science
关键词 高压旋喷锚杆 锚杆 基本试验 蠕变试验 high-pressure rotary jet grouting bolt bolt basic test creep test
  • 相关文献

参考文献2

  • 1JGJ120-2012,建筑基坑支护技术规程[S].
  • 2[英]汉纳TH.胡定,邱作中,刘浩吾等译.锚固技术在岩土工程中的应用[M].北京:中国建筑工业出版社,1987.

共引文献297

同被引文献14

引证文献4

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部