期刊文献+

铁路编组站建设大型现代化物流中心的探讨 被引量:3

Discussion on Constructing Large-scale Modern Logistic Center in Railway Marshalling Station
下载PDF
导出
摘要 随着我国高速铁路"四纵四横"逐步建成,既有线货运能力将得到极大释放,铁路运输能力紧张状况得到有效缓解。在针对我国物流企业现状及存在的问题、展望现代物流发展趋势与前景的基础上,分析铁路编组站建设大型现代化物流中心的优势和必要性,以及铁路编组站建设大型现代化物流中心的途径,提出在铁路编组站建设大型物流中心是铁路改变以往单纯运输经营模式的有效途径,也是铁路货运改革的必然方向。 Following with construction of high-speed railway'4 north-south and 4 east-west lines' in China, the freight traffic capacity of existing line was greatly released and the tense situation of railway traffic capacity was effectively released. Targeting with the status of logistic enterprises in China and its main problems, and based on outlook of modern logistic development trend and foreground, this paper analyzes the advantages and necessity of constructing large-scale modern logistic center in railway marshalling station, as well as the ways of constructing the logistic center. The paper also puts forward that the construction of the logistic center is an effective way of changing simple mode of railway traffic operation in past, moreover, the necessary trend of railway freight transport reform.
作者 刘海涛
出处 《铁道货运》 2013年第7期19-22,5,共4页 Railway Freight Transport
关键词 铁路 编组站 物流中心 建设 Railway Marshalling Station Logistic Center Construction
  • 相关文献

参考文献4

  • 1朱友文.发展集装箱多式联运 建设铁路现代物流中心[J].铁道运输与经济,2011,33(4):59-62. 被引量:2
  • 2盛光祖.全路电视电话会议讲话[N].人民铁道,2013-04-15(A1)[2013-05-15].
  • 3中国物流行业协会.2012-2016年中国物流行业投资分析及前景预测报告[EB/OL].(2012-04-20)[20l3-05-15].http://www.chinabgao.corn/report/print409103.html.
  • 4骆卫青.铁路货场向现代物流中心发展的对策研究[J].现代物流,2009(6):60-61.

二级参考文献2

  • 1苏顺虎.铁路物流系统理论和规划方法[M].北京:中国铁道出版社,2010.
  • 2马克-莱文森.著,姜文波,等译.集装箱改变世界[M].北京:机械工业出版社,2008.

共引文献1

同被引文献19

  • 1刘思思.铁路编组站拓展现代物流服务可行性分析[J].科技资讯,2007,5(27):202-203. 被引量:3
  • 2刘世峰.铁路接轨站设计应考虑的因素[J].铁道运输与经济,2005,27(10):76-78. 被引量:17
  • 3中华人民共和国铁道部.GB50091-2006铁路车站及枢纽设计规范[S].北京:中国铁道出版社,2006.
  • 4宇海龙.新建格尔木至库尔勒铁路可行性研究[D].西安:中铁第一勘察设计院,2013.
  • 5周珂.格尔木城市总体规划[D].上海:同济城市规划设计研究院,2014.
  • 6Boysen N, Fliedner M, Jaehn F, et al. Shunting YardOperations: Theoretical Aspects and Applications[J].European Journal of Operational Research, 2012,220(1):1-14.
  • 7Rhodes M. North American Railyards[M]. St. Paul: MBIPublishing Company, 2003.
  • 8Boysen N, Jaehn F, Pesch E. Scheduling Freight Trains inRail-rail Transshipment Yards [J]. Transportation Science,2011,45(2): 199-211.
  • 9Bektas T, Crainic T G,Morency V. Improving the Per-formance of Rail Yards through Dynamic Reassignments ofEmpty Cars[J]. Transportation Research Part C, 2009,17(3): 259-273.
  • 10Boysen N, Fliedner M, Jaehn F, et al. Survey on ContainerProcessing in Railway Yards [J]. Transportation Science,2013, 47(3): 312-329.

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部