斜拉索相对拔出量控制二张索力技术研究 被引量:1

Study of Technique of Using Relative Pull-Out Length to Control Force of Second Cable Tensioning for Cable-Stayed Bridge
下载PDF
导出
摘要 为能及时张拉且准确控制斜拉桥主梁悬臂拼装过程中斜拉索的二张索力,以某混合式结合梁斜拉桥为背景,推导斜拉索相对拔出量与对应索力增量的计算公式,采用有限元法分析了主梁悬臂拼装阶段桥塔偏位、主梁悬臂端位移以及对应索力三者之间的关系,并根据桥塔偏位、主梁悬臂端位移具有相对独立性的关系对相对拔出量公式进行了简化。实践表明,采用相对拔出量简化公式控制斜拉索的二张索力,有效地克服了温度对斜拉索二张索力的影响,实测值与理论值较吻合;张拉时间不受限制,节省了工期。 In order to ensure the timely tensioning of the stay cables for the second time as well as the accurate control of the tensioning forces during the process of the cantilever assembly of the main girder of cable-stayed bridge, a hybrid type cable-stayed bridge with composite girder was cited as an example. The computing formula of the relative pull-out length of stay cables and the corresponding cable force increment was derived. The finite element method was adopted to analyze the relations among the pylon offsetting, the displacement at the ends of the main girder cantilevers and the corresponding cable forces in the cantilever assembling stage of the main girder. Considering that the pylon offsetting and displacement at the ends of the main girder cantilevers are relatively independent, the formula of the relative pull-out length was simplified. It is proved that the application of the simplified formula of relative pull-out length to control the second tensioning forces of the stay cables effectively overcomes the impact of temperature on the force of the second tensioning of stay cables, the calculated values and the measured data are basically agreed, the time of the stay cable tensioning is not restricted by other construction procedures, thereby, the construction time is saved.
出处 《世界桥梁》 北大核心 2013年第4期50-53,共4页 World Bridges
关键词 斜拉桥 结合梁 斜拉索 相对拔出量 索力 理论计算 应用 cable-stayed bridge composite girder stay cable relative pull-out length cable force theoretical calculation application
  • 相关文献

参考文献7

二级参考文献19

  • 1胡利平,凌育洪.脉动法索力测量技术及相关参数分析[J].中南公路工程,2004,29(4):47-49. 被引量:15
  • 2冉志红,李乔.斜拉索非线性振动的奇异摄动解法[J].西南交通大学学报,2006,41(3):355-359. 被引量:19
  • 3戴诗亮.随机振动实验技术[M].清华大学出版社,1984..
  • 4林元培.斜拉桥[M].北京:人民交通出版社,1995..
  • 5李延直译.斜拉桥设计与施工[M].北京:中国建筑工业出版社,1980..
  • 6吴天毅.测试技术与测试信号处理[M].北京:清华大学出版社,1991..
  • 7华南理工大学城市建设研究中心.广东省西部沿海高速公路崖门大桥施工监控工作总结[R].,2002..
  • 8Hironaka Zui et al. Practical formulas for estimation of cable tension by vibration method[J]. Journal of structural engineer ing, June,1996.
  • 9中铁大桥勘测设计院有限公司.重庆李渡长江大桥设计文件[Z].2005.
  • 10中铁大桥勘测设计院有限公司东南桥梁诊治研究中心.重庆李渡长江大桥监测资料[Z].2006.

共引文献89

同被引文献11

引证文献1

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部