摘要
总结了国内地铁系统设备房安装装修中常见的施工现场协调难、成品保护与损失纠责难、隐患整改难等问题。从系统设备房安装装修设计、分标、施工组织与管理等方面提出了对这些问题的解决思路。
By summarizing common problems in the instal- lation and decoration of domestic subway system devices room,such as the difficulties in reconciliation at construc- tion site, the protection of the finished products and com- pensation for the losses, as well as the rectification of hid- den dangers, some effective and feasible solutions to the de- sign, the bidding section division, the construction organiza- tion and management of the installation and decoration of subway system device room are proposed.
出处
《城市轨道交通研究》
北大核心
2013年第7期14-16,共3页
Urban Mass Transit
关键词
地铁
系统设备房
安装装修
subway
system devices room
installation anddecoration