摘要
通过对深圳市轨道交通三号线3101标段使用的φ6.28m土压平衡盾构机同部注浆系统原理图及同步注浆系统组成要素的分析,阐述了同步注浆系统中注浆泵出口处注浆压力的理论计算及极限压力值、系统每条注浆管线中实际砂浆量的设定值、同步注浆时间、注浆速度及砂浆罐容积等主要设计参数的确定依据,及如何设计注浆系统主参数。同时阐述了如何运用同步注浆控制系统,调节注浆压力和注浆量的大小,防止浆液扰动造成地表隆起与沉降,有效控制地表变形,保证掘进施工正常进行。
It mainly expounds how to confirm main parameters as following: theoretic calculation of grouting pressure at pump outlet、upper and lower limit of grouting pressure、grouting flow、grouting time、grouting speed and mortar tank cubage in mortar system,and how to design main parameters of mortar system,by analysing mortar system scheme and mortar system structure for φ6.28m EPB(used for the tunnel works of Lot 3101 of Shenzhen Metro 2nd stage Line3).It also expounds how to apply mortar control system to adjust grouting pressure and grouting flow,prevent motor disturbing to make the ground upheaval or settlement,and ensure boring construction to progress normally.
出处
《机械设计与制造》
北大核心
2013年第1期191-193,共3页
Machinery Design & Manufacture
基金
国家重点基础研究发展计划(973计划)(2010CB736007)
关键词
同步注浆系统
注浆压力
注浆量
注浆时间
砂浆罐容积
控制
Mortar System
Grouting Pressure
grouting Flow
Grouting Time
Mortar Tank Cubage
Control