期刊文献+

产品研发中基于ProA的知识管理

ProA-Based Knowledge Management in Product Research and Development
下载PDF
导出
摘要 产品研发过程质量、资源、成本、进度全局集成管理和综合优化是制造企业提高竞争力的重要途径。为了实现产品研发过程四要素集成优化,基于活动及其实现过程(ProA)信息集成建模方法,分析了产品研发中ProA的知识需求,探讨了产品研发中ProA的知识以及ProA的知识获取机理,论述了基于ProA的知识管理过程,使产品知识管理过程与产品研发过程集成,促进知识的传递、共享和再利用,有效地服务于产品研发过程中的具体活动,为产品研发全过程的决策和推理奠定基础。 The integrated optimization toward the quality,resource,cost and scheduling for the whole product development is becoming one of the significant strategies to improve the competition power of manufacturing companies.To realize multipleobjective integrated optimization of product research and development(RD),knowledge demand,knowledge sort and knowledge acquisition mechanism were brought out based on ProA information integrated modeling.Finally,knowledge management process based on ProA was discussed,making the product knowledge management process and product RD process integration,and promote knowledge sharing and reuse,which is the foundation of decision-making and reasoning for product RD whole process.
出处 《机械设计与制造》 北大核心 2013年第7期257-259,共3页 Machinery Design & Manufacture
基金 国家自然科学基金(70971120) 河南省高等学校青年骨干教师资助计划项目(2009GGJS-098) 河南省教育厅科技攻关项目(2010B120012) 郑州市创新型科技人才队伍建设工程(10LJRC183)
关键词 产品研发 集成优化 知识管理 PROA Product Research and Development Integrated Optimization Knowledge Management ProA
  • 相关文献

参考文献7

二级参考文献19

  • 1沙全友,秦现生,胡立红,李民,蒋志强.面向产品研发的过程模型建立[J].计算机工程与应用,2007,43(5):86-89. 被引量:5
  • 2张宏国,徐晓飞,战德臣.基于工作分解结构的跨企业项目多级网络计划[J].计算机集成制造系统,2007,13(3):513-519. 被引量:19
  • 3Umble Elisabeth J, Haft Ronald R, Michael Umble M. Enterprise resource planning: Implementation procedures and critical success factors. European Journal of Operational Research, 2003, 146(2): 241-257.
  • 4Xue Yajiong, Liang Huaigang, William R Boulton, et al. ERP implementation failures in China: Case studies with implications for ERP vendor. International Journal of Production Economies, 2005, 97: 279-295.
  • 5Jaideep Motwani, Ram Subramanian, Pradeep Gopalakrishna. Critical factors for successful ERP implementation: Exploratory findings from four case studies. Computers in Industry, 2005, 6: 529-544.
  • 6Babu A J G, Suresh N. Project management with time, cost, and quality considerations. European Journal of Operational Research, 1996, 88(2): 320-327.
  • 7Liu Baoding, Zhao Ruiqing, Wang Gang. Uncertain programming with applications. Beijing: Tsinghua Univ. Press, 2003.
  • 8Feng Yuncheng. Activity network analysis. Beijing: Beijing University of Aeronautics & Astronautics Press, 1991
  • 9Feng Chunwei, Liu Liang, Burns S A. Stochastic construction time-cost trade-off analysis. Journal of Computing in Civil Engineering, 2000, 14(2): 117-126.
  • 10Michalewicz J Z. Genetic Algorithms + Data Structures= Evolution Programs. 3rd ed. Berlin: Springer-Verlag, 1996.

共引文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部