期刊文献+

扣件式钢管脚手架安全事故控制体系研究 被引量:1

Accident Control Research of Fastener-Type Steel-Tube Scaffold
下载PDF
导出
摘要 本文针对扣件式钢管脚手架安全事故控制进行研究,并在实际的操作层面建立一套脚手架事故控制体系,由程序控制、因果分析图、质量对策表、质量检验评分体系、验收记录表五个环节组成,简单实用,可作为工程参考。 Abstract: The article introduced the research of accident control of scaffold project. A set of accident control system of fastener - type steel -tube scaffold which is easy to master and very practical is established. The accident control system of the scaffold is composed by five links, which are program control, causal analysis chart, quality countermeasures table, quality inspection rating system, and acceptance record table. This will guide construction and control quality.
作者 张孟文
出处 《福建建设科技》 2013年第4期42-43,共2页 Fujian Construction Science & Technology
关键词 脚手架 事故控制 五个环节 Scaffold accident control five links
  • 相关文献

参考文献2

  • 1住房和城乡建设部质量安全监管司.普通脚手架架子工[M].北京:中国建筑工业出版社,2010.
  • 2光明日报出版社.中华人民共和国行业标准-建筑施工工具式脚手架安全技术规范JG202-2010[M].北京:光明日报出版社.2010.

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部