摘要 许多制造企业从大规模制造转向大规模定制,采用按订单生产的策略,由于时间限制只能选择部分订单;在流水车间中,订单排序会影响所选订单的完工时间,因此产生了订单选择和排序集中优化的问题.对于双机器流水车间中的订单选择和排序问题,提出了一个混合整数规划的数学模型,在CPLEX优化软件中实现了模型算法.通过算例验证了该模型的逻辑正确性;设计了数据实验,结果显示订单规模不超过40个时,模型可在较短时间内得到最优解.对于订单规模更大的问题,设计了启发性算法,得到的订单选择和排序方案对应的利润值与最优值约只差4.52%.最后,对订单选择和排序集中决策相比单独决策获得的额外收益进行了测算. Many manufacturing enterprises are transtbrming their production strategies fi'om the production mode of MTS (Make-To-Stock) to MTO (Make-To-Order). As the planning horizon is limited, manuthcturers have to choose orders fi'om the whole. Besides, the make-span of the selected orders is relevant to the processing sequence. Thus, manufacturers are considering how to make integrated decisions of order selection and production scheduling. First, an MIP (Mixed-Integer-Programming) mathematical model is proposed and coded by calling CPLEX Optimization Software. Then, through a data example, the model is shown to how to get an optimal solution. Besides, a data experiment is designed showing that the model can get the optimal solution to a problem with an order size less than 40. When it comes to a problem with an order size more than 40, a heuristic algorithm is designed. According to the experiment, the profit gap between the value by heuristic and that of the optimal is about 4.52% of the latter. Lastly, it measures the additional profit gained by the integrated order selection and production scheduling in a two-machine flow shop.
出处 《西南民族大学学报(自然科学版)》 CAS 2013年第4期616-623,共8页 Journal of Southwest Minzu University(Natural Science Edition)
关键词 流水车间 按订单生产 订单选择 排序 优化 CPLEX flow shop MTO order selection scheduling optimization CPLEX
  • 相关文献

参考文献7

  • 1GUNASEKARAN A,NGAI E W T.Build-to-order supply chain management.A literature review and framework for development[J].Journal of Operations Management,2005,23(5):423-451.
  • 2BALAKRISHNAN N,PATTERSON J,SRIDHARAN V.Rationing capacity between two product classes[J].Decision Science,1996,27(2):185-214.
  • 3GHOSH J B.Job selection in a heavily loaded shop[J].Computers and Operations Research,1997,24(2):141-145.
  • 4DEFREGGER F,KUHN H.Revenue management for a make-to-order company with limited inventory capacity[J].OR Spectrum,2007,29(1):137-156.
  • 5WESTER F A W,WIJNGAARD J,ZIJM W H M.Order acceptance strategies in a production-to-order environment with setup times and due-dates[J].International Journal of Production Research,1992,30(6):1313-1326.
  • 6DE P,GHOSH J B,WELLS C E.Job selection and sequencing on a single machine in a random environment[J].European Journal of Operational Research,1993,70(3):425-431.
  • 7HUANG SIMIN,LU MENGSHI,WAN GUOHUA.Integrated order selection and production scheduling under MTO.International Journal of Production Research,2011,49(13):4085-4101.

同被引文献16

  • 1张宏国.资源约束下的单件生产订单作业选择优化算法[J].计算机工程与应用,2006,42(14):204-207. 被引量:1
  • 2郭源生.基于顾客满意度的客户订单选择[J].西安电子科技大学学报(社会科学版),2007,17(6):36-40. 被引量:5
  • 3Gunasekaran A,Ngai E W T.Build-to-order supply chain management:a literature review and framework for development[J].Journal of Operations Management,2005,23(5):423-451.
  • 4Lee Ik Sun,Sung C S.Single machine scheduling with outsourcing allowed[J].Int J Production Economics,2008,111(2):623-634.
  • 5Cesaret B,Oguz C,Salman F S.A tabu search algorithm for order acceptance and scheduling[J].Computers&Operations Research,2012,39(6):1197-1205.
  • 6Ball M O,Chen C Y,Zhao Z Y.Material compatibility constraints for make-to-order production planning[J].Operations Research Letters,2003,31(6):420-428.
  • 7Huang Simin,Lu Mengshi,Wan Guohua.Integrated order selection and production scheduling under MTO[J].Int J Production Research,2011,49(13):4085-4101.
  • 8Roundy R,Chen C,Chen P,et al.Capacity-driven acceptance of customer orders for a multi-stage batch manufacturing system:models and algorithms[J].IIIE Transactions,2005,37(12):1093-1105.
  • 9Eberhart R,Kennedy J.A new optimizer using particle swarm theory[C]//Proceedings of the Sixth International Symposium on Micro Machine and Human Science,Nagoya,Japan,1995:39-43.
  • 10Shi Y,Eberhart R.A modified particle swarm optimizer[C]//Proceedings of the IEEE World Congress on Computational Intelligence,1998:69-73.

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部