摘要
结合北同蒲铁路原平至太原北段扩能改造工程的自动闭塞工程,对既有线车站信号改造过渡方案进行探讨。
Combining with the automatic block engineering of Yuanping-Taiyuan northern section in the reconstruction project of Beitongpu railway line, the paper discusses the transitional solution to the station signal reconstruction of the existing line.
出处
《铁路通信信号工程技术》
2013年第3期74-75,共2页
Railway Signalling & Communication Engineering
关键词
自动闭塞
过渡
信号改造
automatic block
transition
signal reconstruction