摘要
小型水电站技术改造设计中由于受现有厂房布置、地下土建部分等因素限制,较新建电站的设计更为复杂。对此,以陆浑水库水电站增效扩容改造为例,在分析电站改造必要性和可行性的基础上,探讨了电站装机容量的确定及机组选型的设计思路,为工程设计提供了参考依据。
The design of technological transformation of small hydropower station is more complex than building a new one because the former has been limited by factors such as existing plant layout and underground construction. Tak- ing the efficiency improving and capacity-expanding transformation engineering of hydropower station of Luhun Reservoir for an example, this paper discusses the determination of power plant installed capacity of the hydropower station and the design of turbine type selection based on the analysis of necessity and feasibility of the technological transformation, which provides a reference for engineering design.
出处
《水电能源科学》
北大核心
2013年第7期181-183,共3页
Water Resources and Power
基金
国家自然科学基金资助项目(51109189)
中国博士后科学基金资助项目(20100471007)
关键词
小水电站
增效扩容
技术改造
水能复核计算
机组选型
small hydropower station
capacity expansion
technological transformation
calculation of hydropower checking