摘要 通过对左坝肩卸荷岩体边坡地质条件和工程特性研究,左坝肩边坡不存在滑动破坏的底滑面。计算表明,不存在发生大规模整体滑移式失稳的可能。通过采取工程措施对坝顶高程以上边坡削坡减载、挂网喷混凝土防护和预应力锚索加固综合处理后,左坝肩边坡的安全性明显提高。 This article through to the left dam shoulder of unloading rock mass slope geological conditions and engineering characteristics of side slope of the left dam abutment,there is no sliding failure of the bottom surface,calculation shows that,there is no large-scale integral sliding instability may.By taking engineering measures on the crest elevation of above slope cutting slope unloading,shotcrete net protection and prestressed anchor reinforcement treatment,side slope of the left dam abutment safety improved.
出处 《水利科技与经济》 2013年第7期95-97,共3页 Water Conservancy Science and Technology and Economy
关键词 右坝肩边坡 加固处理 稳定性评价 库什塔依水电站 Kushentayi hydropower station dam right abutment reinforcement stability evaluation
  • 相关文献

参考文献5

  • 1新疆水利水电勘测设计研究院.库什塔依水电站工程工程地质报告[R].乌鲁木齐:新疆水利水电勘测设计研究院,2010.
  • 2新疆水利水电勘测设计研究院.库什塔依水电站工程可行性研究报告[R].乌鲁木齐:新疆水利水电勘测设计研究院,2010.
  • 3水利部.库什塔依水电站左岸坝肩卸荷岩体工程特性研究报告[R].乌鲁木齐:水利部长江勘测技术研究所,新疆维吾尔自治区水利水电勘测设计研究院,2010.
  • 4曲苓,宋瑞华,汪洋,张宏.克孜尔水库右坝肩边坡稳定分析及加固措施[J].农业科技与信息,2009(23):58-59. 被引量:3
  • 5汪洋,焦阳,乔玲.库什塔依左坝肩强卸荷带防渗处理[J].水利与建筑工程学报,2011,9(3):79-82. 被引量:3

二级参考文献5

  • 1库什塔依项目组.库什塔依水电站工程地质报告[R].乌鲁木齐:新疆水利水电勘测设计研究院,2010..
  • 2库什塔依项目组.库什塔依水电站工程可行性研究报告[R].乌鲁木齐:新疆水利水电勘测设计研究院,2010..
  • 3余学明,何顺宾.冶勒水电站沥青混凝土心墙堆石坝基础防渗处理设计[C]..第一届堆石坝国际研讨会文集.四川:成都,2009..
  • 4曲苓,宋瑞华.恰甫其海粘土心墙坝设计[C]..第一届堆石坝国际研讨会文集.四川:成都,2009..
  • 5刘安荣,陈秋华,李根,祁亚丽,曹传波.复杂地基处理中化学灌浆及质量控制的研究[J].水利与建筑工程学报,2010,8(1):60-61. 被引量:8