摘要
既有线电化改造过程中接触网与雨棚的接口设计是一项重要内容,武夷山站地处风景名胜区,结合武夷山站既有雨棚形式分别从接触网功能的实现、景观效果等方面对多种方案进行比选。确定合架方案后进行了支柱选型、与房建专业接口等内容的设计,通过加强施工过程中的接口管理,在满足接触网功能的前提下,兼顾了景观效果、车站使用等要求,避免了既有线电化改造后雨棚漏雨、接触网支柱与雨棚柱外观差别较大,影响美观等问题,改造后雨棚柱与既有雨棚柱外观保持一致。
In the process of electrification renovation of existing line, the interface design between the overhead contact line system(OCS) and the platform canopy is an important content. Considering that Wuyishan Railway Station is located at landscape and famous scenery area, in combination with the patterns of existing platform canopy at Wuyishan Railway Station, various interface schemes were put into comparison, respectively from the aspects such as the OCS function, the visual effect and so on. After the jointly-built scheme was determined, several designs were carried out like the model selection design of OCS posts, the interface design with architecture and structure subjects. And then, on the premise of meeting the OCS function, by strengthening interface management, and by giving consideration to the demands of visual effect and the station utilization, some problems were avoided, such as rain leakage of the canopy after renovation, big appearance difference between OCS posts and canopy columns which cannot accord with aesthetic requirement. The appearances of canopy columns after the renovation can accord with that of existing canopy columns.
出处
《铁道标准设计》
北大核心
2013年第8期123-124,128,共3页
Railway Standard Design
关键词
铁路客站
电化改造
雨棚
接口
railway passenger station
electrification renovation
canopy
interface