期刊文献+

允许横向供应单级多点库存系统器材配置研究 被引量:4

Study on material allotment for single-echelon and multi-depot inventory system with horizontal supply
下载PDF
导出
摘要 针对允许横向供应的单级多点库存系统,建立了库存系统不缺货(not out of stock,NOOS)概率和器材保障总延误时间模型,并给出了给定各点库存数量下保障延误时间仿真算法。在此基础上,以库存系统的总保障延误时间最小为目标,以库存系统的NOOS概率为约束,提出了一种器材配置优化的策略,并用算例验证了保障延误时间仿真算法和器材配置优化策略的可行性。 Aiming at the single echelon and multidepot inventory system with horizontal supply,the models of not out of stock(NOOS) probability and total material support delay time are established.The simulation algorithm of support delay time under a given material number of every depot is offered.Based on these models,an optimal strategy for material allotment is put forward with the object of minimal total material support delay time and subject to satisfy the NOOS probability requirement.The feasibility of the algorithm and the optimal strategy is validated by an example.
出处 《系统工程与电子技术》 EI CSCD 北大核心 2013年第7期1451-1454,共4页 Systems Engineering and Electronics
基金 中国博士后科学基金(20080431380)资助课题
关键词 器材 保障延误时间 不缺货概率 蒙特卡罗仿真 material support delay time not out of stock(NOOS) probability Monte Carlo simulation
  • 相关文献

参考文献20

  • 1Asater S. Evaluation of unidirectional lateral transshipments andsubstitutions in inventory systems[J]. European Journal of Operational Research, 2003, 14(9) : 438 - 447.
  • 2Mirzahosseinian H, Piplani R. A study of repairable parts inven- tory system operating under performance-based contract[J]. Euro- pean Journal of Operational Research, 2011, 214(2) : 256 - 261.
  • 3Jin T D, Tian Y. Optimizing reliability and service parts logistics for a time-varying installed base[J]. European Journal of Operational Research, 2012, 218(1):152- 162.
  • 4van Jaarsveld W, Dekker R. Estimating obsolescence risk from demand data to enhance inventory control-A case study[J]. In- ternational Journal of Production Economics, 2011, 133 ( 1 ) : 423 - 431.
  • 5Sberhrooke C. Multi echelon inventory systems with lateral sup- ply[J]. Naval Research Logistics, 1992, 39(1): 29-40.
  • 6Grahovac J, Chakravarty A. Sharing and lateral transshipment of in- ventory in a supply chain with expensive low-demand items[J]. Management Science, 2001, 47(4) : 579 - 594.
  • 7Tagaras G. Effectiveness of stock transshipment under various demand distributions and no negligence transshipment times[J]. Production and Operations Management, 2002, 11(2) : 183 - 198.
  • 8司书宾,贾大鹏,兑红炎,孙树栋.带有横向调度的两级维修备件库存系统优化方法研究[J].西北工业大学学报,2008,26(6):765-770. 被引量:9
  • 9Chien Y H, Chen J H. Optimal spare ordering policy for preven- tive replacement under cost effectiveness eriterion[J]. Applied Mathematical Modelling, 2010, 34(3): 716- 724.
  • 10Lin Y K. Spare routing problem with p minimal paths for time- based stochastic flow networks [J ]. Applied Mathematical Modelling, 2011, 36 (3) : 1427 - 1438.

二级参考文献22

  • 1何亚群,谭学峰,金福禄.基于可用度的飞机可修件需求分析[J].系统工程与电子技术,2004,26(6):848-849. 被引量:22
  • 2王佩高,金家善.随舰备件动态管理及备件数量计算模型[J].海军工程大学学报,2005,17(3):103-106. 被引量:23
  • 3王子萍,黄培清,葛静燕.基于横向补货的库存协调近似模型[J].工业工程与管理,2006,11(4):24-28. 被引量:5
  • 4Sherbrooke C C. METRIC. a Multi-Echelon Technique for Recoverableitem Control. Operations Research, 1968,16, 122-141
  • 5Lin Chinho, Lin Yihsu. A Cooperative Inventory Policy with Deteriorating Items for a Two-Echelon Model. European Journal of Operational Research, 2007, 178(1): 92-111
  • 6Yang Mingfeng. A Two-Echelon Inventory Model with Fuzzy Annual Demand in a Supply Chain. Journal of Information&Optimization Sciences, 2006, 27(3): 537-548
  • 7Mohammad H AI-Rifai, Manuel D Rossetti. An Efficient Heuristic Optimization Algorithm for a Two-Echelon (R,Q) Inventory System. International Journal of Production Economics, 2007, 109(1/2): 195-213
  • 8Axsater Sven. Evaluation of Unidirectional Lateral Transshipments and Substitutions in Inventory System. European Journal of Operational Research, 2003, 149(2) : 438-447
  • 9LEE H L. A multi-echelon inventory model for repairable items with emergency lateral transshipments[ J]. Management Science, 1987, 33(10) :1302-1316.
  • 10AXSATER S. Modeling emergency lateral transshipments in inventory systems [J]. Management Science, 1990, 36( 11 ) :1329-1338.

共引文献21

同被引文献76

  • 1冯申,杨自春.典型任务剖面内舰船机电单部件系统备件配置方法研究[J].船舶工程,2005,27(5):59-62. 被引量:6
  • 2陈庆,易宏,张裕芳.基于完好性的石油平台动力系统备品备件研究[J].海洋工程,2006,24(4):62-67. 被引量:1
  • 3Molenaers A, Herman B, Liliane P, et al, Criticality classifica- tion of spare parts: a case study[J]. International Journal of Production Economics, 2012, 140(2) : 570 - 578.
  • 4Sherbrooke C C. Optimal inventory modeling of system : multi- echelon techniques[M]. 2nd ed. Boston: Artech House, 2004.
  • 5Ward R, Ruud T, Willem V J. A two-step method for forecasting spare parts demand using information on component repairs[J]. Eu- ropean Journal of Operational Research, 2012, 220(2) : 386 - 393.
  • 6Francesco C, Giulio D G, Massimo T. Multi-echelon, multi-in- denture spare parts inventory control subject to system availabili- ty and budget constraints[J]. Reliability Engineering & System Safety, 2013, 119(11): 95-101.
  • 7Moon S, Hicks C, Simpson A. The development of a hierarehi-cal forecasting method for predicting spare parts demand in the south korean navy--a case study[J]. International Journal of Production Economics, 2012, 140(2): 794-802.
  • 8Karsten F, Slikker M, Van Houtum G J. Inventory pooling games for expensive, low-demand spare parts[J]. Naval Re- search Logistics, 2012, 59(5) : 311 - 324.
  • 9Moon S, Simpson A, Hicks C. The development of a classifica- tion model for predicting the performance of forecasting methods for naval spare parts demand[J]. International Journal of Pro- duction Economics, 2013, 143(2): 449- 454.
  • 10Block J, Ahmadi A, Tyrberg T, et al. Fleet-level reliability a- nalysis of repairable units., a non-parametric approach using the mean cumulative function [J]. International Journal of Per formability Engineering, 2013, 9(3) : 333 - 344.

引证文献4

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部