摘要 结合宝山矿的实际情况建立了碎石黄泥泵送胶结充填系统,从30多组碎石黄泥泵送胶结充填料中选择了7组配比进行强度测试。在满足采矿工艺要求和可泵性、充填体强度的前提下,使用黄泥替代32%的水泥,最终强度只降低0.65 MPa(9.7%),而充填成本可节约23. This paper establishes the rock-clay cementing and pumping backfill system combining with the actual situation in Baoshan mine.Seven of more than thirty groups of rock-clay cementing and pumping backfill materials are selected to make the strength test.Under the premise of meeting requirements on the mining process,pumpability and fill-body strength,yellow mud is adopted to replace 32% of the cement,with the final strength only decreasing 0.65 MPa(9.7%) and filling cost savings of 23.78 yuan/m3.
作者 袁梅芳
出处 《金属矿山》 CAS 北大核心 2013年第6期46-48,共3页 Metal Mine
关键词 碎石黄泥 高压泵送 胶结充填 降低成本 Rock-clay High-pressure pumping Cemented filling Cost reduction
  • 相关文献

参考文献4

二级参考文献18

共引文献38

同被引文献18

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部