摘要
介绍了赞比亚KONKOLA铜矿KDMP项目985 m水泵房的立式水仓钢结构设施的安装情况。由于施工方案合理,施工方法及步骤行之有效,安全技术措施到位,既避免了措施工程的发生,又缩短了工期,实现了安全、优质、快速施工。
The paper introduces the installment conditions of steel structure facilities of vertical sump in KDMP 985m pump house project of Zambia KONKOLA Copper Mine.Due to adopting the reasonable construction scheme,method and procedures and effective and safe technical measures,the engineering accident is avoided,and the construction period is also shortened,realizing the safe,high-quality,rapid construction.
出处
《金属矿山》
CAS
北大核心
2013年第6期106-108,共3页
Metal Mine
关键词
水仓
安装
浮筏
Sump
Installation
Raft