期刊文献+

鄱阳湖水利枢纽大孔闸闸门型式比选 被引量:1

Comparsion and selection of the gate type of the macroscopic void water gate for Poyang Lake Water Control Project
下载PDF
导出
摘要 本文通过介绍、分析部分国内外水利工程大孔闸实例,结合鄱阳湖水利枢纽工程挡水水头高、水位变幅大的特点,按满足江豚在江湖间迁徏要求,从适用性、可靠性、先进性、美观性和可行性等方面进行了比选,建议鄱阳湖水利枢纽大孔闸闸门采用上翻式扇形翻转闸门型式. This paper introduces and analyzes some examples of domestic and foreign macroscopic void water gates.Combined the characteristics of Poyang Lake Water Control Project's high head obstruct water and large amplitude water level and satisfying the requirement of cowfish's moving between rivers and lakes,the selection is made from the suitability,reliability,advanced,aesthetics and feasibility of these plans.The type of upturning sector retroflexion water gate is recommended for the gate of Poyang Lake Water Control Project's macroscopic void water gate.
作者 徐继铭 段明
出处 《江西水利科技》 2013年第2期96-99,共4页 Jiangxi Hydraulic Science & Technology
关键词 鄱阳湖水利枢纽工程 大孔闸 选择 Poyang Lake Water Control Project Macroscopic void gate Selection
  • 相关文献

参考文献8

共引文献11

同被引文献8

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部