结合某化工项目地基处理的实例,介绍山区地基以山皮土作为回填料填平场地,然后采用强夯法处理大面积回填土地基的设计方法。
In a petrochemical project, dynamic consolidation was used to treat the back fill to meet the bearing cap acity. The design process was introduced in this article.