期刊文献+

基于AdmiTest的CTCS-3级列控系统自动测试平台 被引量:2

The Automatic Testing Platform of CTCS-3 Level Train Control System Based on AdmiTest
下载PDF
导出
摘要 根据CTCS-3级列控系统的特点,结合欧洲列车运行控制系统(ETCS)测试经验,研发基于通用测试平台AdmiTest的CTCS-3级列控系统自动测试平台CARSTool。CARSTool采用激励-反馈机制实现单系统或多系统的闭环测试,包含测试对象、仿真系统、链路、消息、激励、响应和测试序列等基本元素,具有线路工程数据配置、通信链路配置、站场线路配置、PI Object、仿真系统、列车运行仿真和自动测试序列7个功能模块。以郑西客运专线列控数据为例,采用CARSTool对CTCS-3级列控系统进行仿真测试。测试结果表明:通过规范化语法严格卡控测试步骤,根据CTCS-3级列控系统测试案例库以及激励-反馈信息判断测试项目的执行状态,CARSTool实现了测试计划、执行过程和测试结果的闭环处理;说明CARSTool能够实现CTCS-3级列控系统的自动测试。 Combining the testing experiences of Europe Train Control System (ETCS) and the features of CTCS-3 level train control system, the automatic testing platform CARSTool of CTCS-3 level train control system based on AdmiTest which is a general purpose testing platform has been developed. CARSTool uses stimulation-feedback mechanism to achieve closed-loop testing of single system or multiple systems. The basic elements of CARSTool include the test subject, simulated system, link, message, stimulation, response and test sequence. CARSTool has seven function modules, i.e. data configuration for line engineering, communication link configuration, line configuration for station and yard, PI Object, simulated system, train running simulation and automatic testing sequence. Train control data of Zhengzhou West Station were used for the simulation test of CTCS-3 level train control system by CARSTool. Test results show that, according to the test case library of CTCS-3, CARSTool which is an automatic testing platform based on AdmiTest has strictly controlled test steps through standardized syntax and used stimulationfeedback mechanism to judge the execution state of testing project. CARSTool has achieved the closed-loop processing of test plan, execution process and test result, which indicates that it can realize the automatic testing function for CTCS-3 level train control system.
出处 《中国铁道科学》 EI CAS CSCD 北大核心 2013年第4期128-136,共9页 China Railway Science
基金 高速铁路系统试验国家工程实验室建设项目(铁计函【2009】1391号)
关键词 CTCS-3级列控系统 激励-反馈机制 系统自动测试 测试平台 CTCS-3 level train control system Stimulation-feedback mechanism System automatic tes ting Testing platform
  • 相关文献

参考文献9

  • 1ADDEO F, ALLOTTA B, MALVEZZI B, et al. ATP/ATC Subsystem Testing and Validation Using a HIL Test Rig [C] //Computers in Railways IX. Southampton: Transactions of the Wessex Institute, 2004: 411-420.
  • 2NICOLA G DE, TOMMASO P DI, ESPOSITO R, et al. A Hybrid Testing Methodology for Railway Control Sys- tems [C] //Computer Safety, Reliability and Security. Potsdam Germany: in Lecture Notes in Computer Science (LNCS), 2004: 116-135.
  • 3TOMMASO P DI, FLAMMINI F, LAZZARO A, et al. The Simulation of Anomalies in the Functional Testing of the ERTMS/ETCS Trackside System [C] //High-Assurance Systems Engineering. Heidelberg Germany: IEEE Computer Society, 2005:131-139.
  • 4赵显琼,李开成,唐涛,袁磊.基于TTCN-3的CTCS-3级列车运行控制系统自动测试方法[J].铁道通信信号,2010,46(7):15-20. 被引量:2
  • 5HUANG Hongfu. AdmiTestTM Framework User's Guide [M]. Bahnhofplatz: Systransis AG, 2010: 2-5.
  • 6中华人民共和国铁道部.科技运E2008334号CTCS-3级列控系统总体技术方案[M].北京:中华人民共和国铁道部,2008.
  • 7中华人民共和国铁道部.科技运E20083113号CTCS-3级列控系统功能需求规范(FRS)[M].北京:中华人民共和国铁道部,2008.
  • 8中华人民共和国铁道部.科技运E20083127号CTCS-3级列控系统系统需求规范(SRS)[M].北京:中华人民共和国铁道部,2008.
  • 9中华人民共和国铁道部.科技运E20087116号CTCS-3级列控系统系统测试案例(V1.0)[M].北京:中华人民共和国铁道部,2008.

二级参考文献3

  • 1科技运[2008]34号,CTCS-3级列车控制系统总体技术方案[S].铁道部科学技术司,铁道部运输局.北京,2008.
  • 2BI Jun.WU Jianping.An Approach to Concurrent TTCN Test Generation[J].Journal of Computer Science and Technol-ogy 1999,14(6) 614-618.
  • 3ETSI ES 201 873-1 V3.1.1,Methods for Testing and Specification (MTS);The Testing and Test Control Notation version 3;Part 1:TTCN-3 Core Language[S],Sophia Antipolis,France,July 2005.

共引文献1

同被引文献13

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部