7[3]Maidl U.Geotechnical and mechanical interactions using the earth-pressure balanced shield technology in difficult mixed face and hard rock conditions[A].In:Proceedings of Rapid Excavation and Tunneling Conference[C].[s.l.]:[s.n.],2003.483-493.
8[4]Clough G W.EPB shield tunneling in mixed face conditions[J].Journal of Geotechnical Engineering,1993,119:1 640-1 656.
9GB50007-2002.建筑地基基础设计规范[S].[S].,..
10Attewell P B,et al.Soil movements induced by tunneling and their effects on pipelines and structures[M].[s.l.]:[s.n.],1986.