摘要
对广钢轧钢厂厂房环境及结构不同区段、不同部位的温度情况 ,对结构损坏现状及混凝土的强度和碳化情况进行了检测鉴定 ,并对其缺陷进行了分析 ,提出了加固处理方法。
The temperature condition in the different region and position of the factory building structure and the factory building environment of a rolling steel plant, the present situation of structure injure, as well as the strength and carbonigation condition of concrete are examined and determined. The shortcomings of the factory building structure are analysed.And the methods of reinforcing treatment are put forward.