关键路径法在地震监测设施建设定额编制中的应用 被引量:1

Application of critical path method in construction quota compilation of seismological monitoring facilities
下载PDF
导出
摘要 从项目管理角度出发,介绍关键路径法在项目管理中应用的基本原则和方法,并在《地震监测设施建设标准定额体系研究》项目管理中实际应用,不仅在计划制定期间求得工期、资源、成本的优化,而且在计划的执行过程中,通过信息反馈,进行有效的监督、控制和调整,保证项目在预定期望中的目标实现,通过识别并严格执行关键路径,提高项目管理的效率,压缩项目实施进度。 From the project management point of view, the application of project management princi- ples and methods of the critical path method(CPM) is introduced. Furthermore, the method is used practically in the project management of Seismological Monitoring Facilities Construc- tion Standard Quota System Research. Not only obtains the optimization of project duration, resources and cost during the planning stage, but also ensures the implementation of expec- ted goal of the project through the feedback and effective monitoring, controlling and adjust- ment during the executing stage. Through recognizing and implementing the key critical path strictly, it is achievable to improve the effect of project management and reduce the schedule of project.
出处 《地震地磁观测与研究》 2013年第3期107-112,共6页 Seismological and Geomagnetic Observation and Research
基金 地震行业科研专项项目(200908033) 黑龙江省科技攻关计划项目(GC09C201)
关键词 关键路径法 地震监测 建设定额 项目管理 critical path method(CPM), seismological monitoring, construction quota, pro-ject management
  • 相关文献

参考文献4

二级参考文献4

  • 1杰克·吉多,克莱门斯.成功的项目管理.张全成等译.北京:机械工业出版社,1990.227~340.
  • 2科兹纳.项目管理:计划进度与控制的系统方法.北京:电子工业出版社,2002.530~563.
  • 3中国地震局.地震标准汇编(第1-3册)[M].北京:地震出版社,2009.
  • 4中国地震局.中国数字地震观测网络项目验收材料[R].2008.

共引文献15

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部