摘要
通过施工方案的比选,确定在昆明枢纽扩能改造工程中采用高压旋喷桩帷幕施工方案,具体阐述了其施工工艺和安全质量保证措施,实践证明,采用该方案克服了钻孔、注浆困难的情况,解决了流砂层地层桩基难以成孔的难题,节约了成本。
Based on construction scheme comparison,the high-pressure jet grouting curtain pile foundation holing construction scheme is determined to apply in Kunming hub energy-expansion transformation engineering. The paper specifically describes its construction technology and security quality guarantee measures. Practice proves that: the scheme solves drilling and grouting difficulties,solves quicksand stratum pile holing problem,and saves cost as well.
出处
《山西建筑》
2013年第23期167-169,共3页
Shanxi Architecture
关键词
高压旋喷桩
流砂地层
桩基成孔
施工技术
high-pressure jet grouting pile
quicksand stratum
foundation holing
construction technology