期刊文献+

安太堡露天矿半移动式破碎站工艺优化实践 被引量:1

Optimization practice of Antaibao surface mine semi-continuous station technology
下载PDF
导出
摘要 半移动式破碎站的工艺优化改造是国内半连续开采工艺的新探索,填补了半移动式破碎站的设计的缺陷,为大型露天煤矿间断式采煤工艺向半连续采煤工艺改造积累了大量的先进经验,并值得向其他同行推荐和推广,是端帮井巷掘进和露天矿单斗卡车采煤工艺的经典结合,经济效益和环保节能效益明显。 On the basis of the practical situation,optimization of semi-continuous crushing station is the research in semi continuous mining system,It consummated the design disadvantages and accumulated rich experience for the large surface coal mine,it is a perfect combination of the tunnel in the end slope and the shovel-truck mining in surface coal mine,It is environmental protection and energy saving effect is obvious,and is worth popularizing in coal industry.
作者 王子君 闫俊
出处 《露天采矿技术》 CAS 2013年第7期33-35,38,共4页 Opencast Mining Technology
关键词 半移动式破碎站 半连续采煤工艺 安太堡露天矿 semi-continuous crushing station semi-continuous mining technology Antaibao surface coal mine
  • 相关文献

参考文献5

  • 1盂如.半移动式破碎站控制系统的设计[R].河北理工大学信息学院.
  • 2国平.大型破碎站的移设步距确定方法应用研究[R].神华集团准格尔能源有限公司选煤厂.
  • 3刘利杰.黑岱沟露天煤矿毛煤破碎站移设方案优化[R].神华集团准能公司哈尔乌素露天矿.
  • 4刘勇.安太堡露天煤矿后期破碎站移设位置确定[R].中煤能源集团有限公司.
  • 5余绍泽,李示波,黄志安.端帮煤长壁废石充填开采工艺研究[R].北京科技大学.

同被引文献8

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部