摘要
根据目前确定的建安工程造价偏高的现状,对控制量、指导价及竞争费进行了分析。
In this paper, according to the current situation that the construction cost is higher than practice, a few of new concepts are analysed including control quality, guiding price and competitive fee. A new method severed cost form quality is presented.
出处
《湖南城建高等专科学校学报》
2000年第1期31-33,共3页
Journal of Hunan Urban Construction College