亚泰水泥项目取水合理性分析 被引量:2

Rationality Analysis of Water In-taking for Yatai Cement Project
下载PDF
导出
摘要 利用水文资料,对浑江干流取水口以上流域、大梨树沟取水口以上流域作为亚泰水泥项目取水水源进行分析计算,得出大梨树沟取水口浅层地下水年可供水量为103万m3,不能满足现状水平年2010年用水量3 478 m3/d,取水量127万m3/d的要求,大梨树沟取水口年用水总量不能满足工程用水要求,不足部分由浑江干流取水口补充,浑江干流取水口处2010年可供水量为3.59亿m3/a,2020年取水口处可供水量为2.47亿m3/a。 By using the hydrological data, analysis and calculation are conducted for the upstream watershed of water in-take at Hun River mainstream, the upstream watershed of water in-take at Dalishugou,which are designed as water source for Yatai Cement Project. The results indicate that shallow groundwater at Dalishugou can provide 103 × 10^4m3 yearly, which can not meet the water demand of 3478 m3/d or 127 × 10^4m3/a in actuality year. The water intake at Hun River mainstream can supplement the shortage of Dalishugou water source, availablewater supply at the water intake of Hun River mainstream is 3.59× 10^8m3/a in 2010 ,and 2. 473.59 × 10^8m3/a in 2020.
出处 《黑龙江水利科技》 2013年第7期21-24,共4页 Heilongjiang Hydraulic Science and Technology
关键词 取水水源 径流系列 来水量 用水量 供水保证率 取水量 water source runoff series water inflow, water use guarantee rate of water supply water in-taking
  • 相关文献

参考文献1

  • 1牛占.水文勘测工[M].郑州:黄河水利出版社,2011.

共引文献2

同被引文献6

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部