摘要
地下室外墙、承台侧壁等侧向构件承担水平荷载具有很大的不确定性,常规采用的低承台桩基有可能承受较大的甚至导致破坏的水平力,建议用桩伴侣改善传统基桩的构造形式,特别是对于承台与桩间土摩擦力小或者桩身范围地基土模量低的两类状况。在罕遇地震时,作为抗震概念设计的耗能构件,首先牺牲伴侣,避免或延迟桩头的破坏;复合地基如果设计不当会破坏或削弱褥垫层隔震的效果,可在伴侣与桩之间预留缓冲空间。
It is uncertain that the lateral components such as basement wall and cap side wall bearing horizontal load,so the conventional pile foundation with low cap might endure lateral force that is larger,and even cause its damage.The applying of pile partner to improve traditional foundation pile structure form is put for ward,especially when there is few frictional force between pile cap and soil,or the soil modulus is small.The partner can be component for anti-earthquake concept design under rare earthquake action,pile partner may be sacrificed firstly to keep pile perform well.The improper design of composite foundation will destroy or weaken the isolation effect of pillow,and can be solved by reserving buffer space between pile and partner.
出处
《工程抗震与加固改造》
北大核心
2013年第4期87-92,86,共7页
Earthquake Resistant Engineering and Retrofitting
关键词
桩伴侣
基桩抗震概念设计
牺牲伴侣
褥垫层
pile partner
anti-earthquake concept design of pile
pile partner sacrificed firstly
pillow