摘要
介绍了昆钢新区热电站一期25MW余热发电系统的基本情况和组成,对该系统的设计特点和运行效果进行了说明。
In this paper, the basic situation and composition of 25 MW waste heat generate electricity of first-stage project in new industrial park were introduced, and the design features and operation results of the system were described.
关键词
热电站余热发电系统设计特点
thermal power plants
waste heat generate electricity system
design features