3Stacey, C,S.A.P. Ltd. REFURBISHMENT, RISK AND RE-SPONSIBILITY - DECISIONS WHEN UPGRADING TUNNEL FIRE PROVISIONS[A].2012.
4Sturm P. J.B.M.B.M,A. Graz University Of Technology. THE INFLUENCE OF PRESSURE GRADIENTS ON VENTILATION DESIGN - SPECIAL FOCUS ON UPGRADING LONG TUNNELS[A].Messecenter Graz-Tagungszentrum,2012.