溪洛渡大坝运行初期安全风险与应对措施分析 被引量:2

Analyses on Safety Risks and Countermeasures in Initial Operation of Xiluodu Dam
下载PDF
导出
摘要 大坝投运初期面临的安全风险相对较大。结合类似工程案例和溪洛渡水电站工程实际情况,分析了工程建成投运后在地震震损、坝体开裂、泄洪消能设施损坏及库岸边坡失稳等方面可能面临的安全风险,并从运行管理角度,提出了从制度建设、技术管理和科技创新等方面入手采取的应对措施,以确保大坝运行初期的安全稳定。 The safety risk of a dam is relatively high in initial operation. Combined with similar engineering cases and the actual situation of Xiluodu Hydropower Station, the safety risks of project operation are analyzed from the aspects of earthquake damage, dam cracking, damage of flood discharge and energy dissipation facilities and slope collapse. The countermeasures for eliminating the safety risks are proposed from the perspective of operation and management to ensure the safety and stability of dam in initial operation, such as rules and regulations establishment, technical management and technology innovation.
出处 《水力发电》 北大核心 2013年第8期4-8,共5页 Water Power
关键词 大坝 安全运行 风险分析 应对措施 溪洛渡水电站 dam safe operation risk analysis countermeasures Xiluodu Hydropower Station
  • 相关文献

参考文献12

二级参考文献31

共引文献65

同被引文献9

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部