溪洛渡水电站水垫塘底板抗冲耐磨混凝土施工技术 被引量:5

Construction of Abrasion and Erosion Resistant Concrete in Plunge Pool of Xiluodu Hydropower Station
下载PDF
导出
摘要 溪洛渡水电站泄洪消能具有落差大、流速高、流量大、泥沙多等特点,这对下游水垫塘底板及反弧面抗冲耐磨混凝土施工质量提出了极高的要求。为此,施工中进行了配合比优化,采用合理的施工工艺并规范施工,保证了施工质量和进度。现场检测表明,溪洛渡水电站水垫塘抗冲耐磨混凝土体形、表面平整度及外观质量控制优良。 The flood discharge in Xiluodu Hydropower Station has a high head, high speed and large llow and contains a lot of sediment, which make a high quality requirement on abrasion and erosion resistant concrete construction on the bottom plate and ogee surface of plunge pool. To this end, the construction quality and progress of abrasion and erosion resistant concrete are guaranteed by optimizing mix proportion ratio, using reasonable construction process and regulating the construction. The on-site testing shows that the controls on shape, surface roughness and external appearance of abrasion and erosion resistant concrete in the plunge pool are good.
出处 《水力发电》 北大核心 2013年第8期23-26,共4页 Water Power
关键词 施工工艺 抗冲耐磨混凝土 水垫塘 溪洛渡水电站 construction technology concrete with abrasion and erosion resistance plunge pool Xiluodu Hydropower Station
  • 相关文献

参考文献2

  • 1付冗初,谭靖夷,等.水利水电工程施.北京:中国电力出版社.2002.
  • 2庸本.特种混凝土设计与施工(精)『M].北京:中国建筑出版社.2005.

同被引文献32

引证文献5

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部