机组组合在含风电系统的备用协调优化 被引量:4

Optimization of Reserve Coordination in the Unit Commitment for Wind Power Integration
原文传递
导出
摘要 针对风电出力、负荷预测偏差,发电机组故障停运等不确定因素,在传统模型的基础上,增加负荷跟踪时间和快速旋转备用的限制,建立兼顾系统运行效益和备用效益的机组组合模型。以快速旋转备用来平抑风电功率和负荷的波动,以系统的发电成本和备用成本之和最小为目标函数,采用改进的遗传—粒子群算法优化求解。算例仿真验证了模型和算法的有效性。 For the uncertainties such as the forecasting errors of wind power and load and the unit outage,a new method to solve the optimal unit commitment problem is proposed.In this method,the traditional unit commitment model was improved by adding the load tracking time and rapidly spinning reserve restraint so as to stabilize the fluctuations of the wind power and load.The optimization model aims to minimize the sum of operation cost and spinning reserve cost,and an improved GA-PSO algorithm is applied to solve the optimal model.During the optimization process,heuristic adjustments are applied based on the principle of energy-saving dispatch,so that the unit with high capacity and low coal consumption can keep full output power.The simulation results verify the effectiveness of the model and the algorithm.In the pursuit of minimizing the operation cost,the model can not only adapt the change of the uncertainties in system,but also improve system reliability to a large extent through dynamic adjustment of spinning reserve.
出处 《华东电力》 北大核心 2013年第7期1481-1484,共4页 East China Electric Power
基金 国家高技术研究发展基金项目(2011AA05A119) 国家自然科学基金项目(51037003)~~
关键词 机组组合 协调优化 旋转备用 风电 unit commitment coordination and optimization spinning reserve wind power
  • 相关文献

参考文献5

二级参考文献42

共引文献261

同被引文献90

  • 1杨明,韩学山,王士柏,查浩.不确定运行条件下电力系统鲁棒调度的基础研究[J].中国电机工程学报,2011,31(S1):100-107. 被引量:50
  • 2陈海焱,陈金富,段献忠.含风电场电力系统经济调度的模糊建模及优化算法[J].电力系统自动化,2006,30(2):22-26. 被引量:216
  • 3张利,赵建国,韩学山.考虑网络安全约束的机组组合新算法[J].电网技术,2006,30(21):50-55. 被引量:31
  • 4徐慧明,毕天姝,黄少锋,杨奇逊.计及暂态过程的多支路切除潮流转移识别算法研究[J].中国电机工程学报,2007,27(16):24-30. 被引量:41
  • 5李晓磊,周京阳,于尔铿,等.电力系统机组组合研究综述[C]//中国高等学校电力系统及其自动化专业第二十四届学术年会论文集(上册).北京:中国农业大学,2008:803.807.
  • 6AULT G W,BELL K R W,GALLOWAY S J. Calculation of Economic Transmission Connection Capacity for Wind Power Generation[J]. IET Renewable Power Generation, 2007,1 (1) : 61-69.
  • 7AHMIDI A,GUILLAUD X,BESANGER Y.A Multilevel Approach for Optimal Participating of Wind Farms at Reactive Power Balancing in Transmission Power System [J ]. IEEE Systems Journal, 2012,6 (2) : 260-269.
  • 8GERBER A,QADRDAN M,CHAUDRY M.A 2020 GB Transmission Network Study Using Dispersed Wind Farm Power Output[J].Renewable Energy, 2012,37 ( 1 ) : 124-132.
  • 9李文沅.电力系统安全经济运行[J].模型与方法,1988(32):1-7.
  • 10Padhy N P. Unit commitment problem under deregulatedenvironment-a review[ C]//Proceedings of IEEE Power &Energy Society General Meeting. Toronto : IEEE Power &Energy Society,2003 : 1088 - 1094.

引证文献4

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部