通过对220 kV以上电网对湖州电网的影响分析,给出了未来一段时间湖州电网建设中需要注意的问题并提供了对应的解决方案。对华能长兴电厂异地重建、浙能长兴电厂天然气热电联产工程以及220 kV/500 kV网架变更对湖州电网影响进行了分析。
This paper analyzes the influence of 220 kV and over grid on Huzhou power grid and accordingly presents the problems for attention and the corresponding countermeasures in the certain future period of Huzhou power grid construction.The effects on Huzhou power grid are also analyzed in the aspect of Huaneng Changxing power plant reconstruction in relocated site,Zheneng Changxing power plant gas cogeneration project and 220 kV/500 kV network frame change.