摘要
从施工质量管理的角度出发,提出对35 kV单芯630 mm2电缆的敷设、接头工艺难点进行事中控制的观点,以确保电缆工程的质量、安全。
From the perspective of construction quality management,this paper highlights the in-process quality control for 35 kV single-core 630 mm2 XLPE cable laying and its joint processing difficulties,with a view to ensuring cable engineering quality and safety.
出处
《华东电力》
北大核心
2013年第7期1545-1547,共3页
East China Electric Power