饰面清水混凝土挡土墙的模板设计与施工 被引量:6

DESIGN AND CONSTRUCTION OF FORMWORK FOR FINISHING PLAIN CONCRETE RETAINING WALL
下载PDF
导出
摘要 500kV扬州西变电站施工中,将变电站混凝土挡土墙按照饰面清水混凝土的标准进行施工。大模板设计方案经混凝土板墙模板计算、次梁强度验算、对拉螺栓验算,均满足要求。施工中,严格按照质量控制要点,包括模板安装前的处理、模板拼接节点尺寸的确定、提高模板系统加固的整体性、模板拆除后的处理、混凝土成型质量的控制等施工,施工后的板墙整体观感良好,达到了设计要求。 During the construction of 500kV Yangzhou West Transformer Station, the concrete retaining wall of the transformer station is constructed according to the standard for finishing plain concrete. The design scheme of large formwork successfully satisfy all requirements after calculation of concrete slab wall formwork, joist strength calculation and verification of split bolt, etc. During the construction, key construction points are strictly controlled, such as treatment of formwork before installation, determination of formwork assembly node dimension, improvement of integrity of formwork system reinforcement, treatment of formwork after dismantlement, control on concrete forming quality, etc. Favorable integral appearance is realized on the slab wall and design requirements are satisfied.
作者 赵桐 张晋绪
出处 《建筑技术》 2013年第8期742-745,共4页 Architecture Technology
关键词 饰面清水混凝土 挡土墙 模板设计 施工 质量控制 finishing plain concrete retaining wall formwork design construction quality control
  • 相关文献

参考文献5

二级参考文献9

  • 1杨玉萍,王平,王丹凤.超高墙柱清水混凝土模板施工技术[J].建筑技术,2007,38(4):263-265. 被引量:5
  • 2JGJ162-2008建筑施工模板安全技术规范[S].
  • 3JGJ166-2008,建筑施工碗扣式钢管脚手架安全技术规范[S].
  • 4JGJ169-2009.清水混凝土应用技术规程[S].
  • 5刘富勤,王绪民,胡坤生.超高大跨度结构混凝土梁支撑系统设计与施工[J].建筑技术,2007,38(8):577-579. 被引量:13
  • 6建筑施工脚手架实用手册[M].北京:中国建筑工程出版社,1994,5.
  • 7DB11/T464-2007,建筑工程清水混凝土施工技术规程[S].
  • 8建筑施工手册[M].第4版.北京:中国建筑工业出版社,2005.
  • 9JGJ130-2001.建筑施工扣件式钢管脚手架安全技术规范[S].[S].,..

共引文献44

同被引文献10

引证文献6

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部