摘要 对于采用高强螺旋箍筋约束混凝土柱的装配整体式框架结构,提出了一种新的柱-柱连接方式,即在局部外包钢管设置横穿栓筋进行连接。制作足尺装配整体式柱和整浇柱试件,对其进行低周反复加载拟静力试验。通过观测试件的受力、变形、破坏过程及破坏形态,分析其承载能力、变形能力和耗能能力,验证了新型连接的可靠性。结果表明:在高轴压比下,采用新型连接的高强螺旋箍筋约束混凝土装配整体式柱与相应整浇柱均具有良好抗震性能,可以替代整浇柱应用于高烈度地震设防区的建筑结构中。结合试验,对新型连接的受力机制进行理论分析,提出了连接屈服荷载和破坏荷载的计算式,并通过计算结果与试验结果的比较,验证了理论公式的正确性。 For high strength stirrup confined concrete columns of the frame structure, a new column-column connection is put forward where the local wrapping steel tube and bohing bars are used. The full-scale prefabricated columns and cast-in-place column specimen were produced and experiments of specimens under quasi-static cyclic reversed loading were carried out. The force, deformation, failure process and failure mode of specimens were observed and its load carrying capacity, deformation capacity and energy dissipation capacity were analyzed. The reliability of the new connection was verified. The result of experiments shows that high-strength spiral stirrups confined of concrete monolithic columns and cast-in-place columns have the same excellent seismic performance under high axial compression ratio. The assembled monolithic compound spiral reinforced concrete columns can be adopted in high seismic zones instead of cast-in-place columns. According to the test, the mechanical behavior of a new type of connection was analyzed, and the calculation formula of yield load and maximum load are put forward. By comparing the calculation results and test results, the correctness of the theoretical formulas was verified.
出处 《建筑结构学报》 EI CAS CSCD 北大核心 2013年第8期90-99,共10页 Journal of Building Structures
基金 国家自然科学基金项目(10572107) 河北省地方科技项目(2011188)
关键词 柱-柱连接 局部外包钢管 高强螺栓箍筋 约束混凝土 横穿栓筋 拟静力试验 抗震性能 column to column connection local outsourcing steel tube high-strength spiral stirrups constrainconcrete bolting bar quasi-static test seismic behavior
  • 相关文献

参考文献9

  • 1CECS43:1992钢筋混凝土装配整体式框架节点与连接设计规程[S].北京:中国建筑工业出版社,1992.
  • 2罗青儿,张仟朋,程文瀼,王蕴,翁煜辉.装配整体式钢筋混凝土框架柱榫式接头的试验研究[J].工业建筑,2008,38(10):48-52. 被引量:24
  • 3汪梅,吴炯,何孝春,李刻铭,尧勇.钢筋混凝土全预制柱的受力分析[J].特种结构,2011,28(5):9-12. 被引量:8
  • 4Architectural Institute of Japan (AU). Design and construction of mixed structures composed of reinforced concrete columns and steel beams [ S ]. Tokyo: Architectural institute of Japan, 2001.
  • 5Ersoy U, Tankut T. Precast concrete members with welded plate connections under reversed cyclic loading [J]. PCI Journal, 1993, 38(4) : 94-100.
  • 6宋金声 周小真.用复合矩形螺旋箍增强柱抗震性能的试验研究[J].西安冶金建筑学院学报,1986,(2).
  • 7GB50011-2010,混凝土结构设计规范[S].北京:中国建筑工业出版社,2010.
  • 8GB50011-2010建筑抗震设计规范[S].北京:中国建筑工业出版社,2010.
  • 9Daigo Ishii, Tsuyoshi Tanaka. Evaluation of bearing strength of concrete filling in steel columns: study on structural behavior of connection by filling the joint with concrete for steel members: part 1[J]. Architectural Institute of Japan, 2008, 630 ( 8 ) : 1385-1391.

二级参考文献4

  • 1程文,李爱群,张晓峰,吴亦君.钢筋砼柱的轴压比限值[J].建筑结构学报,1994,15(6):25-30. 被引量:56
  • 2CECS43:92钢筋混凝土装配整体式框架节点与连接设计规程
  • 3CECS28:90.钢管混凝土结构设计与施工规程.[S].,..
  • 4JGJ 101-96 建筑抗震试验方法规程.

共引文献985

同被引文献184

引证文献22

二级引证文献76

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部