板桩码头地下连续墙水下抗冻混凝土的施工与检测

Construction and Checking of Underwater Frost-resistant Concrete in Concrete Diaphragm Wall Project of Sheet-piled Wharf
下载PDF
导出
摘要 唐山港曹妃甸港区煤码头的主体采用深水遮帘式板桩结构,在码头前墙顶部水位变动区的墙体施工中,采用导管法水下现浇强度等级C30、抗冻标号F300的抗冻混凝土。浇筑施工前合理设计抗冻混凝土的配合比,把好拌制混凝土的质量关,现场浇筑时应注意提前0.5 m将普通混凝土更换为抗冻混凝土,可采取钻取芯样的方法检测混凝土的抗压和抗冻强度。 Deepwater covered-type sheet-piled structure is used to be the wharf structure of Tangshan Port Caofeidian Harbor Coal Terminal. C30 F300 frost-resistant concrete is cast in place by using tremie method in the construction of wharf's front wall, which is located in water level fluctuation zone. The rational mixed ratio of frost-resistant concrete is designed and supervised before cast-in-place concrete construction. In addition, common concrete must be replaced with frost-resistant concrete 0.5m ahead the construction of cast-in-place concrete. The compressive and frost-resistant strength of the concrete may be checked by taking concrete core sample.
出处 《港工技术》 2013年第2期43-44,共2页 Port Engineering Technology
关键词 深水遮帘式板桩码头 地下连续墙 水下抗冻混凝土 码头前墙 水位变动区 deepwater covered-type sheet-piled wharf concrete diaphragm wall, underwater frost-resistantconcrete wharf's front wall water level fluctuation zone
  • 相关文献

参考文献5

  • 1JTS257-2008水运工程质量检验标准[S].北京:人民交通出版社.2008.
  • 2JTS202-2011,水运工程混凝土施工规范[S].北京:人民交通出版社,2011:55-57.
  • 3QJ/YH5.5.1-2004抗冻混凝土质量控制与试验检测技术规程[S].天津:中港第一航务工程局,2004.
  • 4JGJ55-2011,普通混凝土配合比设计规程[s].北京:中国建筑工业出版社,2011.
  • 5JTS167—3—2009板桩码头设计与施工规范[S].北京:人民交通出版社,2009.

共引文献51

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部