摘要
锦州港第三港池东岸码头后方堆场的软基加固中采用塑料排水板结合强夯的地基处理工艺,在锦州港尚属首次,简要介绍堆场软基加固施工过程的质量控制方法。根据相关监测数据分析软基加固的效果,其结果表明堆场地基的各项指标均满足设计要求,验证了该软基加固工艺在锦州港地区的可行性,可供同类工程参考。
As a new foundation treatment process, Plastic draining board is firstly combined with tamping method to reinforce stockyard soft base in the rear of No.3 harbor basin east quay at Jinzhou Port. Now quality control method is introduced briefly, which is adopted in the process of stockyard soft base reinforcement. The effect of soft base reinforcement is also analyzed according to relevant monitoring data. The results show that all indices about stockyard foundation satisfy the design requirement, and verify the feasibility of tile soft base reinforcing process applied in Jinzhou Port, which will provide references for similar projects.
出处
《港工技术》
2013年第2期64-66,共3页
Port Engineering Technology
关键词
锦州港
后方堆场
地基处理
塑料排水板
强夯
Jinzhou Port
rear stockyard
foundation treatment
plastic draining board
tamping