摘要
建筑设计:索尔戴维拉一索尔戴维拉一索尔戴维拉建筑事务所ARCHITECTS: Soldevila Soldevila Soldevila Architects本项目旨在为巴塞罗那地铁新9号线上城市关键点处的2座地铁站——拉萨卢特与列菲亚——绘制施工方案。拉萨卢特与列菲亚地铁站是由隧道钻机挖出的地铁线。其地下深度可达60m。拉萨卢特站位于地下34m,列菲亚站深54m。
The aim of the project is drafting the construction project for 2 stations of the new line 9 of the Barcelona Metro, La Satut and L[efia, located in key points of the city. La Sa[ut and Liefia stations belong to the metro line built by a tunnel boring machine, where the metro travets under the ground at depths of up to 60 meters. La Salut Station goes down 34 meters, white Llefia Station goes 54 meters deep.
出处
《世界建筑》
2013年第6期50-57,共8页
World Architecture