摘要
The ESA Sentinel-2 mission developed by European Aeronautic Defense and Space Compagny (EADS) Astrium will be devoted to Earth high resolution spectral imagery for the purpose of a global environmental monitoring. As a subcontractor of EADS Astrium, AMOS was responsible for the manufacturing of the instrument telescope mirrors and for the validation of the telescope alignment procedure. This paper details the mirror manufacturing sequences from mirror CVD-SiC cladding to surface figuring and coating, outlining the metrology steps and their corresponding accuracy budget. The telescope alignment process is described in connection with the tooling and techniques that helped achieve the required optical performance of less than 90 nm RMS wavefront error within the telescope field of view.Pierre Gloesenet