摘要
沙河渡槽的槽身混凝土通过采用钢模台车浇筑方案,加快了施工进度,减少了施工缝,改善了混凝土外观,提高了混凝土实体工程质量。本文介绍了沙河渡槽槽身侧墙钢模台车施工实践经验,可供其他类似工程参考借鉴。
Telescoping steel form casting scheme accelerates construction schedule of Shahe aqueduct body concreting, decreases construction cracks, improves concrete's appearance and its construction quality. The paper describes practical experience of telescoping steel form on the side wall of Shahe aqueduct body, which can provide references for the similar projects.
出处
《水利建设与管理》
2013年第7期26-28,共3页
Water Conservancy Construction and Management
关键词
沙河渡槽
钢模台车
施工方法
Shahe aqueduct
telescoping steel form
construction method