81m高非标准复合钢大门及9×25m推拉钢门安装技术

Installation Technology of 81m Height Nonstandard Composite Steel Gate and Sliding Steel Gate of 9×25m
下载PDF
导出
摘要 某单层大跨厂房,其非标准机械设备(机械部分)建设项目主要包括81m高非标准复合大门、9×25m推拉大门、助推段工作平台、助推段导轨等8种设备。81m高非标准复合大门主要安装单元有轴系主体部分、门体、插销装置、密封装置、支座等,重点介绍了其吊装安装方案以及9×25m推拉大门的门体、轨道等的组装技术。 The non-standard machinery and equipment projects for some single-layer large-span factory consist of 81m height non-standard composite gate,9×25m sliding gate,the boost phase working platform and rails and so on.The hoists and installation measures for the shafting main parts,gate,latch device,seals,bearings etc.of 81m height non-standard composite gate were introduced in detail,as well as the assembling for gate and rails of 9×25m sliding gate.
出处 《施工技术》 CAS 北大核心 2013年第14期47-50,共4页 Construction Technology
基金 中国建筑第八工程局有限公司科技开发课题(2012-23)
关键词 钢结构 安装 吊装 steel structures gate installation hoists
  • 相关文献

参考文献3

  • 1赵熙元主编.建筑钢结构设计手册[M].北京:冶金工业出版社,1995.
  • 2余厚极.简明结构吊装手册[M].北京:中国建筑工业出版社,2001.
  • 3中冶集团建筑研究总院.JGJ81-2002建筑钢结构焊接技术规程[S].北京:中国建筑工业出版社,2003.

共引文献92

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部