±500kV江城线雷击跳闸原因分析及对策 被引量:6

Analysis and countermeasures of lightning trip-out for ±500 kV Jiangcheng line
下载PDF
导出
摘要 结合现场故障调查和±500 kV江城线防雷特性,分析±500 kV江城线雷击故障特征。结果表明,线路设计档距过大及设计地线保护角过大、山区边坡地形效应是±500 kV江城线雷击故障的主要原因。针对直流输电线路的防雷设计和改造,提出了降低架空地线保护角、加装线路避雷器的防雷保护措施。 According to fault investigation in field, the characteristics of lighting stroke fault of ± 500 kV Jiangcheng transmission line is analyzed in this paper. The results show that the oversize design span and shielding angle and side slope effect are the primary cause of lightning trip-out for ±500 kV Jiangcheng line. The lighting protection countermeasures of reducing shielding angle and installing lighting arrester are put forward according to design and reform of lighting protection for DC transmission lines.
出处 《湖南电力》 2013年第3期6-9,共4页 Hunan Electric Power
关键词 输电线路 直流 雷击 故障 对策 transmission line DC lighting fault countermeasure
  • 相关文献

参考文献5

二级参考文献39

共引文献3

同被引文献53

引证文献6

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部